St. Paul, MN – Corval Group has begun construction on a design/build project for Buddy’s Kitchen in Lakeville MN, that will facilitate their future growth with 42,000 additional square footage of freezer space. Designed in cooperation with Corval’s engineering team and VAA engineering, planning, and design services, the project...
Corval served as the General Contractor for PURIS Proteins LLC’s production facility in Dawson, MN. We have worked closely with PURIS since January 2019, providing engineering, constructibility, and cost guidance as it relates to material handling, production/process flow, refrigeration/utility upgrades, selective demolition, and overall construction execution of 57,000 linear...
LDM Foods selected Corval Group and our joint venture partner as the Construction Manager for their Canola Crush facility. The completed facility has a crushing capacity of 2500 mt per day or 850,000 mt per year, which equates to about 10% of Western Canadian canola production. The plant also...
Corval was the prime contractor for CertainTeed’s new asphalt unloading and processing expansion. The purpose of the project was to install mechanical systems to allow for asphalt to be unloaded from rail cars or trucks, processed and stored at the existing facility. The scope of work included installation of...
Corval was the Design-Build Contractor for HaF Equipment and installed new process equipment at Jabil’s Innovation Center in Chaska, MN. Corval’s engineers, millwrights and constructors worked with HaF to provide engineering and design, as well as fabrication and selective procurement for equipment platforms and the installation of specialized manufacturing...
Initially providing pipefitter work for Gerdau’s Capital Improvements project manager, Corval became a go-to” contractor for Gerdau. We performed maintenance, repairs, and capital improvements to their facilities. Projects performed by Corval include emergency smelt furnace repairs, bundler mechanical and piping installation, lime injection system installation, furnace replacement, bag house...
The Corval Group formed a joint venture with designer SSOE to design and build the 30 mgy biodiesel facility. The collaborative efforts of the joint venture allowed the project to be executed on a “fast-track” schedule, a significant value to Freedom Fuels, LLC. This plant converts the state’s abundant...
Corval was the EPC contractor for work on this existing Dow Corning chemical processing plant. Our scope of work for this chemical waste recycling facility included engineering, civil work, building, process piping, electrical, and instrumentation and controls....
Corval was the Design-Build contractor for the expansion of Glacial Lakes Energy’s ethanol production facility. The expansion was executed on a “fast-track” schedule and increased the facility production from 40 mpy to over 100 mpy. We also placed 2,500 cubic yards of structural concrete during the expansion. Corval worked...