Corval was the prime mechanical contractor for this Waste Water Treatment facility project, installing of 40,000 ft of pipe ranging in size from 1” to 60” including stainless steel, carbon, ductile, iron, and PVC. We also installed all major equipment, including coarse and fine screens, grit washers, screen conveyors, turbine and centrifugal pumps, 1,000 HP air blowers, chemical tanks, HVAC equipment, Foul Air Equipment, and more.
- About
- Capabilities
- Industries
- ProjectsProjects by IndustryProjects by Specialty
- Contact