Corval was the EPC contractor for the design, construction, and start-up of this 150 MW natural gas-fired power plant. The plant consists of three Pratt & Whitney FT8-3 Swiftpac combustion turbines with diesel fuel positioned for back-up. The facility provides “regulation” capability to the electrical grid, adjusting its power output every 10 seconds, balancing out the variable output from the wind turbines in the area. Corval placed approximately 4,000 cubic yards of structural concrete during this project.

Client

Northwestern Energy

Industry

Energy and Power

Project Duration

13 Months

Location

Anaconda, MT

Want to know more? Contact us.

Similar Projects

City of Duluth/Evergreen Energy – Hot Water System

Corval installed a new piping system for the City of Duluth,…

NRG – Vikings Chilled Water Distribution

Corval was awarded the interior and exterior construction packages to provide…

Great River Energy – Spiritwood Station

Corval was the general contractor for this power plant in Spiritwood,…