Installation of equipment skids, piping racks, and connection piping for new chilled water and chilled glycol system. Setting of three manufactured ammonia chiller skids along with pre-fabricated chiller building pump skids and piping racks. Chiller skids weighed upwards of 60,000# and single header rack weighed 80,000#. Setting and weld out of exterior four-line pipe racks from new chiller building to connections at new Air Handling Units, with over 1,100 LF of racks between.